08-53 Scope of work
|
status: valid
|
||||
Scope of work may have the following characteristics:
|
|||||
08-54 Feasibility analysis
|
status: valid
|
||||
Feasibility analysis may have the following characteristics:
|
|||||
08-55 Risk measure
|
status: valid
|
||||
Risk measure may have the following characteristics:
|
|||||
08-56 Schedule
|
status: valid
|
||||
Schedule may have the following characteristics:
Note A schedule is consistent with the defined work packages, see 14-10 |
|||||
08-58 Verification Measure Selection Set
|
status: valid
|
||||
Verification Measure Selection Set may have the following characteristics:
|
|||||
08-60 Verification Measure
|
status: valid
|
||||
Verification Measure may have the following characteristics:
|
|||||
08-61 Resource allocation
|
status: valid
|
||||
Resource allocation may have the following characteristics:
Note Work breakdown structure may be used to refine the detailed resource allocation Note A resource allocation may be integrated in a/ be a part of the schedule, see 08-56 Note Resources to be allocated are e.g., personnel/human resources for project roles and physical and material resources such as (special/limited) equipment, tool, licenses, test hardware, test vehicle, climate chambers etc. |
|||||
08-62 Communication matrix
|
status: valid
|
||||
Communication matrix may have the following characteristics:
|
|||||
08-63 Process Monitoring Method
|
status: valid
|
||||
Process Monitoring Method may have the following characteristics:
|
|||||
08-66 Measures against deviations in quantitative process analysis
|
status: valid
|
||||
Measures against deviations in quantitative process analysis may have the following characteristics:
|
|||||