.. # ******************************************************************************* # Copyright (c) 2025 Contributors to the Eclipse Foundation # # See the NOTICE file(s) distributed with this work for additional # information regarding copyright ownership. # # This program and the accompanying materials are made available under the # terms of the Apache License Version 2.0 which is available at # https://www.apache.org/licenses/LICENSE-2.0 # # SPDX-License-Identifier: Apache-2.0 # ******************************************************************************* 08-xx ~~~~~ .. std_req:: 08-53 Scope of work :id: std_req__aspice_40__iic-08-53 :status: valid Scope of work may have the following characteristics: - Summary of deliverables for a project - Intended use for the deliverables - Main functions to be realized - Target delivery date and major milestones - Work products and activities that are not in scope of the project as needed - Target markets - Applicable standards and legal requirements - Reuse options - Integration of third party deliveries .. std_req:: 08-54 Feasibility analysis :id: std_req__aspice_40__iic-08-54 :status: valid Feasibility analysis may have the following characteristics: - Statement about the ability of the project to achieve the project objectives with available resources .. std_req:: 08-55 Risk measure :id: std_req__aspice_40__iic-08-55 :status: valid Risk measure may have the following characteristics: - Identifies - the risk to be mitigated, avoided, or shared (transferred) - the activities to mitigate, avoid, or share (transfer) the risk - the originator of the measure - criteria for successful implementation - criteria for cancellation of activities - frequency of monitoring - Risk treatment alternatives: - treatment option selected- avoid/reduce/transfer - alternative descriptions - recommended alternative(s) - justifications .. std_req:: 08-56 Schedule :id: std_req__aspice_40__iic-08-56 :status: valid Schedule may have the following characteristics: - Identifies the activities to be performed - Identifies the expected, and actual, start and completion date for required activities against progress/completion of activities - Identifies dependencies between activities and critical path - Has a mapping to scheduled resources and input data - Identifies resource allocation, resource workload, and critical resources .. note:: A schedule is consistent with the defined work packages, see 14-10 .. std_req:: 08-58 Verification Measure Selection Set :id: std_req__aspice_40__iic-08-58 :status: valid Verification Measure Selection Set may have the following characteristics: - Include criteria for re-verification in the case of changes (regression). - Identification of verification measures, also for regression testing. .. std_req:: 08-60 Verification Measure :id: std_req__aspice_40__iic-08-60 :status: valid Verification Measure may have the following characteristics: - A verification measure can be a test case, a measurement, a calculation, a simulation, a review, an optical inspection, or an analysis - The specification of a verification measure includes - pass/fail criteria for verification measures (test completion and ending criteria) - a definition of entry and exit criteria for the verification measures, and abort and re-start criteria - Techniques (e.g., black-box and/or white-box-testing, equivalence classes and boundary values, fault injection for Functional Safety, penetration testing for Cybersecurity, back-to-back testing for model-based development, ICT) - Necessary verification environment & infrastructure - Necessary sequence or ordering .. std_req:: 08-61 Resource allocation :id: std_req__aspice_40__iic-08-61 :status: valid Resource allocation may have the following characteristics: - Detailed / named resources are allocated to process tasks - Overall resource workload is considered (e.g., allocation of resources to multiple projects) .. note:: Work breakdown structure may be used to refine the detailed resource allocation .. note:: A resource allocation may be integrated in a/ be a part of the schedule, see 08-56 .. note:: Resources to be allocated are e.g., personnel/human resources for project roles and physical and material resources such as (special/limited) equipment, tool, licenses, test hardware, test vehicle, climate chambers etc. .. std_req:: 08-62 Communication matrix :id: std_req__aspice_40__iic-08-62 :status: valid Communication matrix may have the following characteristics: - List of relevant process internal / external stakeholders - Roles and contact information of the parties involved - Definition of required interfaces between stakeholders - Communication subject - Communication means and frequency - Documentation needs of the communication (e.g., type of communication record) .. std_req:: 08-63 Process Monitoring Method :id: std_req__aspice_40__iic-08-63 :status: valid Process Monitoring Method may have the following characteristics: - Measures including criteria for monitoring effectiveness, suitability, and adequacy of the standard process - Method for collecting and analyzing the monitoring measures .. std_req:: 08-66 Measures against deviations in quantitative process analysis :id: std_req__aspice_40__iic-08-66 :status: valid Measures against deviations in quantitative process analysis may have the following characteristics: - Definition of counter measures actions to address each assignable cause of special causes of variation, or common causes of variation - Effective implementation of these counter measures