Module Safety Plan#
Communication Safety Plan
|
status: draft
security: NO
safety: ASIL_B
|
||||
Functional Safety Management Context#
This Safety Plan adds to the Platform Safety Plan (doc__score_platform_safety_plan) all the module development relevant work products needed for ISO 26262 conformity.
Functional Safety Management Scope#
This Safety Plan’s scope is a SW module of the SW platform Communication Module. The module consists of one or more SW components and will be qualified as a SEooC.
Functional Safety Management Roles#
Role |
Assignee |
|---|---|
Safety Manager |
Alexander Schemmel |
Module Project Manager (= Feature team lead) |
Committers of feature team see Communication FT |
Tailoring#
Additional to the tailoring in the SW platform project as defined in the Platform Safety Plan (doc__score_platform_safety_plan) we define here the additional tailoring on module level.
Excluded for this module are additionally the following work products (and their related requirements):
wp__requirements_inspect: in version 0.5 the inspections have to be done by the user
wp__sw_arch_verification: in version 0.5 the inspections have to be done by the user
wp__fdr_reports (module’s Safety Analyses & DFA): in version 0.5 the reviews have to be done by the user
Functional Safety Module Work products#
One set of work products for the module and one set for each component of the module:
Module Work products List#
Work product Id |
Link to process |
Process status |
Link to WP |
|---|---|---|---|
valid |
this document |
||
valid |
this document (including the linked documentation) |
||
wp__fdr_reports (module Safety Plan) |
valid |
Communication Safety Plan F... (doc__communication_safety_plan_fdr) |
|
wp__fdr_reports (module Safety Package) |
valid |
Communication Safety Packag... (doc__communication_safety_package_fdr) |
|
wp__fdr_reports (module’s Safety Analyses & DFA) |
valid |
tailored |
|
performed by external experts |
n/a |
<Link to WP> |
|
valid |
Communication Safety Manual (doc__communication_safety_manual) |
||
valid |
Communication Verification ... (doc__communication_verification_report) |
||
valid |
Communication Release Note (doc__communication_release_note) |
Component lola Work products List#
Work product Id |
Link to process |
Process status |
Link to WP |
|---|---|---|---|
valid |
|||
valid |
|||
valid |
tailored |
||
valid |
|||
valid |
tailored |
||
valid |
|||
valid |
|||
valid |
lola/.h/.cpp, LoLa Detailed Design (doc__lola_detailed_design) |
||
valid |
|||
valid |
External process |
||
valid |
<Link to WP> |
||
valid |
Module Safety Package#
To create the safety package (according to gd_guidl__saf_package) the following documents and work products status have to go to “valid” (after the relevant verification were performed).
Module Documents Status#
For all the work product documents the status can be seen by following the “Link to WP”. A summary of the status is also documented in the project’s documentation management plan.
Component Documents Status#
For all the work product documents the status can be seen by following the “Link to WP”. A summary of the status is also documented in the project’s documentation management plan.
Component Requirements Status#
not documented as needs, lola trlc shows no status attribute
Component AoU Status#
ID |
Status |
Tags |
|---|---|---|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
|
valid |
communication |
Component Architecture Status#
see document link LoLa Architecture (doc__lola_architecture) (as above)