Overall Status#

Important

Data collected on: 2026-07-15

Note

This status overview is generated with AI assistance and is not yet fully accurate. It is intended as a directional snapshot — the trend and structure are correct, but individual figures and statuses may still be off. Treat the numbers as indicative until the underlying data sources are fully validated.

This page tracks feature and process status across the SCORE platform modules. It is regenerated from live eclipse-score GitHub repositories pinned via known_good.json.

Process Area 1 — Change Management#

Process Status

Process req. status

ISO 26262 std_req status

Req. verification status

../../_images/need_pie_48a0e.svg ../../_images/need_pie_509b1.svg ../../_images/need_pie_3d33f.svg
Rollout status: 🔄 90%
10/11 deliverables complete

Module

CR approved

Baselibs

✅ Accepted

#549 — ✅ Accepted [v0.5 Certifiable] — Feature request: common libraries for IPC and Logging
#917 — ✅ Accepted [v1.0] — Feature Request for ABI compatible datatypes

Communication

✅ Accepted

#69 — ✅ Accepted [v0.5 Certifiable] — Feature Request for IPC

Logging

✅ Accepted

#68 — ✅ Accepted [v0.5 Certifiable] — Feature Request for Logging

Persistency

✅ Accepted

#95 — ✅ Accepted [v0.5 Certifiable] — Feature Request for Persistency

Time

✅ Accepted

#910 — ✅ Accepted [v1.0] — Feature Request for Time

Config Mgmt

✅ Accepted

#754 — ✅ Accepted [v1.0] — Feature Request for Config Management

Lifecycle

✅ Accepted

#909 — ✅ Accepted [v1.0] — Feature Request for Health & Lifecycle

Security/Crypto

✅ Accepted

#905 — ✅ Accepted [v1.0] — Feature Request for Security & Crypto

Diagnostic Services

✅ Accepted

#911 — ✅ Accepted [v1.0] — Feature Request for Diagnostic Services & Fault Management

NM

❌ Open

Some/IP

✅ Accepted

#914 — ✅ Accepted [v1.0] — Feature Request for SOME/IP Gateway

Process Area 2 — Requirements Engineering#

Process Status

Process req. status

ISO 26262 std_req status

Req. verification status

../../_images/need_pie_7ea35.svg ../../_images/need_pie_709e9.svg ../../_images/need_pie_6551e.svg
PA2 implementation progress

Fig. 67 Total Feature and Component Requirements across the 11 PA2 modules per release (v0.5.0-beta → v0.6.0 → v0.7.0 → v0.8).#

Rollout status: 🔄 45%
15/33 deliverables complete

Module

Feature Req

Component Req

Req. Inspection

Baselibs

✅ Available (17/17)

✅ Available (112/112 comp_req + 32/32 AoU)

🔄 30% (3/10)

Communication

✅ Available (53/53)

✅ Available (363/363 comp_req [TRLC] + 33/33 AoU)

ipc (310) [TRLC]
ipc_fields (17) [TRLC]
ipc_methods (3) [TRLC]
message_passing (33) [TRLC]

❌ Open

Logging

✅ Available (46/46)

✅ Available (22/22 comp_req)

❌ Open

Persistency

✅ Available (37/37)

✅ Available (35/35 comp_req)

✅ Available (2/2)

kvs

Time

✅ Available (15/15)

❌ Open

❌ Open

Config Mgmt

✅ Available (13/13)

❌ Open

❌ Open

Lifecycle

🔄 0% (0/92)

🔄 0% (0/1 comp_req + 0/1 AoU)

❌ Open

Security/Crypto

✅ Available (41/41)

❌ Open

❌ Open

Diagnostic Services

✅ Available (22/22)

❌ Open

❌ Open

NM

❌ Open

❌ Open

❌ Open

Some/IP

✅ Available (5/5)

✅ Available (8/8 comp_req)

❌ Open

Process Area 3 — Architecture Design#

Process Status

Process req. status

ISO 26262 std_req status

Req. verification status

../../_images/need_pie_8a05d.svg ../../_images/need_pie_d011d.svg ../../_images/need_pie_8674a.svg
PA3 architecture progress

Fig. 68 Total Feature and Component Architecture elements across the 11 PA2 modules per release (v0.5.0-beta → v0.6.0 → v0.7.0 → v0.8).#

Rollout status: 🔄 27%
9/33 deliverables complete

Module

Feature Arch

Component Arch

Arch. Inspection

Baselibs

✅ Available (3/3)

🔄 97% (139/142)

🔄 80% (8/10)

Communication

✅ Available (3/3)

✅ Available (16/16)

❌ Open

Logging

✅ Available (2/2)

✅ Available (3/3)

❌ Open

Persistency

✅ Available (9/9)

🔄 0% (0/3)

🔄 0% (0/2)

🔄 kvs

Time

❌ Open

❌ Open

❌ Open

Config Mgmt

❌ Open

❌ Open

❌ Open

Lifecycle

🔄 60% (3/5)

✅ Available (15/15)

❌ Open

Security/Crypto

❌ Open

🔄 0% (0/21)

❌ Open

Diagnostic Services

❌ Open

❌ Open

❌ Open

NM

❌ Open

❌ Open

❌ Open

Some/IP

✅ Available (1/1)

✅ Available (4/4)

❌ Open

Process Area 4 — Implementation#

Process Status

Process req. status

ISO 26262 std_req status

Req. verification status

../../_images/need_pie_bce92.svg ../../_images/need_pie_21dd0.svg ../../_images/need_pie_05ca2.svg
PA4 implementation progress

Fig. 69 Estimated Lines of Code across the 11 PA2 modules per release (v0.5.0-beta → v0.6.0 → v0.7.0 → v0.8).#

Rollout status: 🔄 45%
20/44 deliverables complete

Module

SW Dev Plan

Code

Detailed Design

Impl. Inspection

Baselibs

✅ Available

✅ Available (~344,200 LOC)

❌ Open

🔄 0% (0/9)

Communication

✅ Available

✅ Available (~274,000 LOC)

❌ Open

❌ Open

Logging

✅ Available

✅ Available (~53,200 LOC)

❌ Open

❌ Open

Persistency

✅ Available

✅ Available (~18,000 LOC)

❌ Open

🔄 0% (0/1)

🔄 kvs

Time

✅ Available

✅ Available (~25,700 LOC)

❌ Open

❌ Open

Config Mgmt

✅ Available

✅ Available (~21,200 LOC)

❌ Open

❌ Open

Lifecycle

✅ Available

✅ Available (~54,300 LOC)

❌ Open

❌ Open

Security/Crypto

✅ Available

✅ Available (~51,700 LOC)

❌ Open

❌ Open

Diagnostic Services

✅ Available

❌ Open

❌ Open

❌ Open

NM

✅ Available

❌ Open

❌ Open

❌ Open

Some/IP

✅ Available

✅ Available (~39,500 LOC)

❌ Open

❌ Open

Process Area 5 — Verification#

Process Status

Process req. status

ISO 26262 std_req status

Req. verification status

../../_images/need_pie_3c916.svg ../../_images/need_pie_fd7af.svg ../../_images/need_pie_dc2a3.svg
PA5 verification progress

Fig. 70 Test counts and coverage across the 11 PA2 modules per release (v0.5.0-beta → v0.6.0 → v0.7.0 → v0.8).#

Rollout status: 🔄 33%
26/77 deliverables complete

Note

C0/C1 Coverage data is sourced from the reference_integration CI (Code Quality & Documentation workflow, bazel coverage --config=ferrocene-coverage). C0 = line coverage, C1 = branch coverage. Rust coverage reports line coverage only. Modules not yet integrated into the reference_integration CI (Config Mgmt, Security/Crypto, Some/IP) show ❌ Open.

Note

Static Code Analysis is tracked per module via dedicated CI workflows (clang-tidy for C++, Rust Clippy for Rust). All listed workflows are zero-tolerance (CI fails on any finding), so a passing main branch implies 0 open findings. Additionally, CodeQL runs centrally across all pinned repositories in reference_integration (finding counts require the GitHub Security tab).

Dynamic Code Analysis is tracked via sanitizer CI workflows (ASan/UBSan/LSan via --config=asan_ubsan_lsan, TSan via --config=tsan). All listed workflows are zero-tolerance, so a passing main branch implies 0 sanitizer findings.

Module

Unit Tests

C0/C1 Cov

Comp. IT

Feat. IT

Static

Dynamic

Module Ver. Rpt

Baselibs

✅ Available

25833 tests

🔄

C0: 94.9%
C1: 61.9% (cpp)

✅ Available

13 tests

❌ Open

✅ 0 findings

✅ 0 findings

🔄 Draft

Communication

✅ Available

3301 tests

🔄

C0: 96.22%
C1: 94.19% (cpp)

✅ Available

63 tests

❌ Open

🔄 Configured (no CI)

✅ 0 findings

🔄 Draft

Logging

✅ Available

650 tests

🔄

C0: 96.8%
C1: 74.1% (cpp)
Rust line: 39.86%

✅ Available

8 tests

✅ Available

1 test

❌ Open

❌ Open

❌ Open

Persistency

✅ Available

95 tests

🔄

C0: 94.7%
C1: 63.0% (cpp)
Rust line: 92.66%

✅ Available

44 tests

✅ Available

53 tests

✅ 0 findings

❌ Open

✅ Available

Time

✅ Available

314 tests

🔄

C0: 88.7%
C1: 61.1% (cpp)

✅ Available

4 tests

❌ Open

❌ Open

❌ Open

❌ Open

Config Mgmt

✅ Available

190 tests

❌ Open

❌ Open

❌ Open

✅ 0 findings

❌ Open

❌ Open

Lifecycle

✅ Available

248 tests

🔄

C0: 83.9%
C1: 56.9% (cpp)
Rust line: 53.81%

✅ Available

36 tests

❌ Open

✅ 0 findings

❌ Open

❌ Open

Security/Crypto

✅ Available

5 tests

❌ Open

✅ Available

11 tests

❌ Open

❌ Open

❌ Open

🔄 Draft

Diagnostic Services

❌ Open

❌ Open

❌ Open

❌ Open

❌ Open

❌ Open

❌ Open

NM

❌ Open

❌ Open

❌ Open

❌ Open

❌ Open

❌ Open

❌ Open

Some/IP

✅ Available

375 tests

❌ Open

✅ Available

21 tests

❌ Open

❌ Open

❌ Open

❌ Open

Platform Verification Report

Platform Verification Report — ❌ Open (single project-wide deliverable; not yet published at the pinned score ref)