Tool Management Work Products#
Platform Tool Management Plan
|
status: valid
|
||||
Tool Management Plan (Part of the Platform Management Plan) |
|||||
Tool Verification Report
|
status: valid
|
||||
According to the safety tool process, each tool’s confidence level (TCL) must be determined. In addition security topics must be considered, as tool user manuals, access control for tools, proper tool documentation, guidelines, protection against malware introduction, etc. Based on TCL the appropriate qualification methods shall be applied. For the project the method validation of software tool must be used. |
|||||