.. # ******************************************************************************* # Copyright (c) 2025 Contributors to the Eclipse Foundation # # See the NOTICE file(s) distributed with this work for additional # information regarding copyright ownership. # # This program and the accompanying materials are made available under the # terms of the Apache License Version 2.0 which is available at # https://www.apache.org/licenses/LICENSE-2.0 # # SPDX-License-Identifier: Apache-2.0 # ******************************************************************************* .. _process_req: Process Requirements List ######################### Automation Status via Process Requirement Table *********************************************** All process requirements should be labelled with the priorization of automation implementation: - A label "manual" means nothing to do, because it must be fulfilled manually (e.g. by filling attributes). It can be added a prio (to denote that this req is a must for v0.5 add "prio_1") - A label "done_automation" means nothing to do, because it already works. Note that in docs-as-code repository there are tool requirements linking to the process requirements with an "Implemented" attribute. - A label "prio_*_automation" means the prio 1, 2, ... labelled requirement shall be implemented in this order. Prio 1 is everything we need for the re-audit, prio 2 could be done manually as a fallback, prio 3 is nice to have ... .. needtable:: :style: table :types: gd_req :columns: id;status;tags :colwidths: 25,10,25 :sort: id